Measurement system analysis

VDA 5: Measurement uncertainty of measurement system and process, with example

TL;DR
  • VDA 5 assesses a measurement method by its measurement uncertainty: every influence gets a standard uncertainty.
  • First the measurement system on the standard (Q_MS at most 15 %), then the measurement process with appraisers, parts and environment (Q_MP at most 30 %).
  • To prove conformance, the usable tolerance shrinks by a guard band at each limit.

About 10 min read

Contents

What this is about

Every measured value is a little bit wrong. That is not a criticism but physics: the standard used to set the gage is itself only known to a certain accuracy, the display rounds, the temperature varies, the part is not perfectly round, and every appraiser applies the gage slightly differently. Honestly, you should therefore not write “10.046 mm” but “10.046 mm ± 0.005 mm”. This ± 0.005 mm is the measurement uncertainty.

VDA 5 asks: how large is this uncertainty, and is it small enough for the tolerance? Unlike classic MSA, which reads spreads from a study, VDA 5 collects all influences individually, like a list of ingredients, rates each with a number and adds them up. That gives an uncertainty budget. You then see not only whether the measuring method is adequate but also which influence costs the most.

Rule of thumb: measurement uncertainty is the answer to the question “How far could my measured value be from the true value?”. The closer a part is to the tolerance limit, the more this answer matters.

The terms in plain words

Standard uncertainty u
The uncertainty of a single influence, expressed like a standard deviation. Each influence gets its own u, for example uT for temperature.
Evaluation from measurements
Some u are determined from series of measurements, for example repeatability as the standard deviation of 25 measurements.
Evaluation from prior knowledge
Other u are estimated from data sheets, calibration certificates or experience, for example “temperature distorts the result by at most 1.5 µm”.
Rectangular distribution
If you only know a limit ± a and do not know where the value lies in between, you assume every value is equally likely. The standard deviation of such a distribution is a / √3, i.e. about 0.58 · a.
Combined uncertainty
All u are squared, added, and the square root of the sum is taken. That is how independent influences add up, similar to variances in a gage R&R.
Expanded uncertainty U
The combined uncertainty times 2. The range ± U contains the true value with about 95 % probability.
Measurement system MS and process MP
The measurement system is the instrument with standard and display, checked under the best conditions. The measurement process is measuring in daily use with real parts, appraisers and environment.
Capability ratio Q
What percentage of the tolerance the uncertainty takes up: Q = 2 · U / T. Smaller is better.

Purpose

VDA 5 “Measurement and inspection processes” assesses a measurement method by its measurement uncertainty: how far can a result deviate from the true value, and is that small enough for the tolerance? VDA 5 separates two stages: the measurement system and the measurement process.

The separation has a practical reason. If the instrument alone is already too inaccurate, there is no need to investigate further. If the instrument is good but the measurement process is not, the problem lies with parts, appraisers or environment, and that is where to act. The difference from classic MSA is explained in VDA 5 or MSA, the basic idea of measurement uncertainty in Measurement uncertainty explained.

How it works

  1. Collect influences: what can distort the result? Typical are standard, resolution, repeatability, bias, appraiser, temperature, form of the part. A cause-and-effect diagram helps not to forget anything.
  2. Measurement system on the standard: determine the calibration uncertainty uCAL from the calibration certificate, resolution uRE, repeatability uEVR from at least 25 measurements on the standard and bias uBI, and the linearity where needed.
  3. Assess QMS: Dietrich and Radeck recommend at most 15 %. If the measurement system already fails, the second stage is not worth doing.
  4. Measurement process: also repeatability on the part uEVO and appraiser influence uAV, usually from a gage R&R, plus part, temperature, stability and other influences, often estimated as a limit.
  5. Assess QMP: recommended at most 30 %.
  6. Adjust the tolerance: to prove conformance, the tolerance shrinks by a guard band at both limits. The agreed decision rule applies (ISO 14253-1).

Worked example, step by step

A diameter of 10.000 ± 0.050 mm (T = 100 µm) is measured with a micrometer, resolution 0.001 mm, as in MSA 2. Known are:

  • According to its calibration certificate, the setting master has xm = 10.0003 mm with an expanded uncertainty U = 1.0 µm (k = 2).
  • 25 measurements on the master give the mean x̄ = 10.00076 mm and the standard deviation s = 0.97 µm.
  • Repeatability on the part and appraiser influence come from the gage R&R of MSA 2.
  • Temperature is estimated to distort the result by at most ± 1.5 µm, the form deviation of the part by at most ± 2.0 µm.

All data are artificial; the measurements on the master are available below as CSV.

Step 1: convert each influence into a standard uncertainty

The influences come in very different forms: as an expanded uncertainty, as a resolution, as a standard deviation, as a limit. To be able to combine them, they are all brought to the same form, the standard uncertainty u.

uCAL=Uk=1.0µm2=0.500µm
The calibration certificate states the expanded uncertainty with k = 2; dividing by 2 gives the standard uncertainty.
uRE=RE23=1µm2·1.732=0.289µm
The display rounds to 1 µm, so the true value lies up to ± 0.5 µm away, equally likely anywhere: rectangular distribution with a = 0.5 µm.
uEVR=s=0.970µm
repeatability on the standard, directly the standard deviation of the 25 measurements
uBI=|x̄−xm|3=|10.00076−10.0003|1.732=0.46µm1.732=0.266µm
The bias is not corrected but carried along as an uncertainty, again like a rectangular distribution.
uT=1.5µm3=0.866µm
uOBJ=2.0µm3=1.155µm
estimated limits with a rectangular distribution: u = a / √3

From the gage R&R come uEVO = 1.190 µm (repeatability on the real part) and uAV = 1.407 µm (appraiser influence); there was no interaction there, uIA = 0. All contributions at a glance:

ContributionInfluenceu in µmcounted in the process
uCALCalibration of standard0.500yes
uREResolution0.289no (smaller)
uEVRRepeatability on standard0.970no (smaller)
uBIBias0.266yes
uEVORepeatability on part1.190yes
uAVAppraiser influence1.407yes
uIAInteraction0.000yes
uOBJForm deviation of part1.155yes
uTTemperature0.866yes

Step 2: measurement system

For the measurement system, calibration, resolution, repeatability on the standard and bias count. But resolution and repeatability overlap: the scatter of the 25 measurements already contains the rounding of the display. So only the larger of the two counts, here uEVR = 0.970 µm. The contributions are squared and added:

ContributionInfluenceu in µmu² in µm²
uCALCalibration of standard0.5000.250
uEVRRepeatability on standard0.9700.940
uBIBias0.2660.071
Sum1.261
uMS=1.261=1.123µm
UMS=2·uMS=2.25µm
combined and expanded uncertainty of the measurement system

The capability ratio relates the whole uncertainty range, i.e. 2 · U from −U to +U, to the tolerance:

QMS=2·UMST=2·2.25µm100µm=4.5%
clearly below 15 %; smallest tolerance at 15 %: 2 · UMS / 0.15 = 0.0299 mm

Step 3: measurement process

For the measurement process, the influences of daily use are added. Of the three repeatabilities (on the standard, on the part, resolution) again only the largest counts, here uEVO = 1.190 µm, because it contains the others. The last column shows how much each contribution adds to the sum of squares:

ContributionInfluenceu in µmu² in µm²Share
uCALCalibration of standard0.5000.2504 %
uEVORepeatability on part1.1901.41524 %
uBIBias0.2660.0711 %
uAVAppraiser influence1.4071.98034 %
uIAInteraction0.0000.0000 %
uOBJForm deviation of part1.1551.33323 %
uTTemperature0.8660.75013 %
Sum5.799100 %
uMP=5.799=2.408µm
UMP=2·uMP=4.82µm
combined and expanded uncertainty of the measurement process
QMP=2·UMPT=2·4.82µm100µm=9.6%
clearly below 30 %; smallest tolerance at 30 %: 0.0321 mm
0.00.40.81.21.6uCAL: Calibration of standard0.50uRE: Resolution0.29 (not counted)uEVR: Repeatability on standard0.97 (not counted)uBI: Bias0.27uEVO: Repeatability on part1.19uAV: Appraiser influence1.41uOBJ: Form deviation of part1.15uT: Temperature0.87Measurement systemMeasurement processStandard uncertainty in µm
Figure 1: Uncertainty budget. Pale: contributions that do not count in the process next to a larger one of the same kind.
Because the values are squared, large contributions count disproportionately. Halving the smallest contribution hardly changes the result. Halving the largest lowers U considerably. So always start with the largest contribution.
InteractiveTry it: uncertainty budget

This chart needs JavaScript.

Start values as in the example. The bars show each contribution’s share of uMP², pale bars do not count. A small contribution changes little, the largest one a lot.

Step 4: tolerance adjustment

What does UMP = 4.8 µm mean for the decision on an individual part? A measured value right at the limit could in reality be up to 4.8 µm off, i.e. inside or outside the tolerance. If you want to prove reliably that a part is OK, you therefore subtract UMP at both limits:

LSL+UMPtoUSL−UMP=9.950+0.0048to10.050−0.0048=9.9548to10.0452mm
zone where conformance is proven (guard band UMP at each limit)

A part at 10.046 mm lies within the tolerance, but in the uncertainty range at the upper limit: conformance is not proven. Whether such a part is shipped anyway is governed by the decision rule agreed with the customer.

LSL 9.950USL 10.050Conformance proven± U± UPart at 10.046 mm9.959.979.9910.0110.0310.05
Figure 2: Green the zone where conformance is proven, orange the uncertainty ranges at the limits.
InteractiveTry it: measured value and uncertainty

This chart needs JavaScript.

Start values as in the example: measured value 10.046 mm, UMP = 4.82 µm. Decision from the manufacturer’s point of view with a guard band of UMP at each limit.

What the result means

QMS = 4.5 % and QMP = 9.6 % are clearly below the recommended 15 % and 30 %. Measurement system and measurement process are suitable for this tolerance. In words: the uncertainty of a measured value is about ± 5 µm with a tolerance of 100 µm.

The largest contribution comes from the influence “Appraiser influence” with 34 % of the sum of squares. To reduce the uncertainty, start there, for example with a more precise measuring instruction and training, as described in MSA 2. The form deviation of the part is also worth noting: it is not an error of the gage, but it belongs to the measurement process because it influences the result depending on where you measure.

Common mistakes

  • Forgetting influences. What is not in the budget does not count, and the uncertainty looks smaller than it is. A cause-and-effect diagram at the start helps.
  • Using the expanded instead of the standard uncertainty. If the calibration certificate states U with k = 2, divide by 2 before entering it in the budget.
  • Counting twice. Resolution and repeatability, or repeatability on the standard and on the part, overlap. Take only the largest.
  • Simply adding standard uncertainties. Correct is: square, add, take the square root.
  • Estimating limits too generously. “Temperature ± 10 µm, to be on the safe side” makes the budget useless. Better estimate with reasons and record the reasons.
  • Confusing Q with %GRR. Both relate to the tolerance but are calculated differently. The numbers are not directly comparable, see VDA 5 or MSA.

In STATlum

Create a “VDA 5” study on the characteristic. The budget is a table: measurement system blue, measurement process green. Contributions come from measurement series, from limits or as a direct value. The evaluation shows all indices of this example.

STATlum: uncertainty budget of a VDA 5 study
Uncertainty budget in the example project: one row per influence with determination, value, share and rank.
STATlum: results of a VDA 5 study
Results: QMS, QMP, expanded uncertainty and smallest testable tolerances.

Frequently asked questions

Which limits apply to Q_MS and Q_MP?

Dietrich and Radeck recommend Q_MS at most 15 % and Q_MP at most 30 %; publications of the VDA on the 3rd edition cite the same values. Your customer’s requirement is binding.

Does VDA 5 replace the gage R&R?

No. In VDA 5 the gage R&R provides the contributions repeatability on the part and appraiser influence. VDA 5 adds further influences such as calibration, temperature and form deviation.

What is the smallest testable tolerance?

The tolerance at which Q just reaches its limit: T_min = 2 · U / Q_max. If a characteristic’s tolerance is smaller, the measurement method is not adequate for it.

What sample size is needed?

For the measurement system at least 25 measurements on the reference standard for repeatability. Repeatability on the part and appraiser influence usually come from a gage R&R. Further influences such as temperature are often estimated as limit values.

Sources

This article explains the method. It does not replace the guideline that applies to your part or the professional assessment of an actual study.